AECAS makes the following test on 100% of the coils / solenoids produced:
- Electrical resistance
- Surge Test (check of the insulation between the wires of the winding)
- Hypot test (check of the insulation to earth or to the outer surface)
- Visual checking
AECAS check on customer request other parameters from sample to 100 %, according to control plans emitted in order to verify the critical issues of the solenoid / coil.
In order to eliminate failures, AECAS registers and stores all the results of the control making statistics.
With inspiration from Automotive norms and the specific requests of the customers we prepare PPAP at the end of a new product development (Process flow, Process Fmea, control plan). AECAS answer promptly to an eventual no conformity, adopting a 8D report.
AECAS adopt a quality certification according to ISO 9001:2008 (download here)